Robotic Cells

Turnkey Cells

We design complete robotic cells: robot, custom grippers, machine vision and integrated PLC. Simulated offline and CE-certified before installation.

Project → Production Offline Simulation CE Certification

Benefits

A single project, a single point of responsibility

Integrated Project

A single contact from technical specification to final testing. Mechanics, electrical, pneumatics and software developed in parallel using agile methodology.

3D Simulation

Layout, cycle and reachability verified offline before producing a single component. Cycle times guaranteed within ±5% of simulation.

CE Certification

Technical file, EN ISO 10218-2 risk analysis and declaration of conformity included. Installation ready for safety audit from day one.


Applications

What we integrate in a cell

01
Assembly

Assembly Cell

Multi-robot cells for sequential assembly with component feeding systems, presence detection and in-line torque verification.

02
Welding

Welding Cell

Welding robots with servo-axis positioners for part rotation. Automatic tool change and real-time monitoring of process parameters.

03
Quality Control

Visual Inspection Cell

Integrated 2D/3D machine vision for dimensional inspection, defect detection and part traceability with QR/datamatrix. Automatic rejection.

04
Logistics

Palletising Cell

Robot with adaptive gripper for pallet building with multiple patterns. Integration with conveyors, stretch wrapper and order management from company WMS.

05
Assembly

Mixed Collaborative Cell

Combination of cobot + industrial robot in the same cell. Operator in a protected zone for manual operations, robot for heavy or hazardous tasks.

06
Quality Control

Automated Test Benches

Automated functional test stations with pneumatic fixtures and structured data collection for SPC and process capability analysis.


Methodology

From brief to start-up

Phase Activities Deliverable Typical duration
01 · Analysis Site visit, feasibility study, KPI definition Technical report 1–2 weeks
02 · Design 3D CAD layout, robot and component selection, BOM Detailed design 3–6 weeks
03 · Simulation Offline simulation of cycle, reachability and collisions Certified cycle times 2–3 weeks
04 · Build Mechanics, electrical panels, robot programming Assembled cell 6–14 weeks
05 · Testing FAT at workshop, CE risk analysis, documentation CE Declaration 1–2 weeks
06 · Start-up Installation, SAT, operator training, go-live Active production 1–2 weeks

Start the project

Configure your cell

Every cell is as unique as the process it automates. Tell us your requirements: we'll propose layout, cycle times and expected ROI within days.